A parapet – in Slovak atika – is the low wall that rises above the surface of a flat roof and closes it off around the edge. Its top is exposed to rain, frost and sun from every side, and when water gets into it, it goes straight into the masonry and behind the external wall insulation.

Sheet
Parapet coping
Revision
Sources
6 items
Type
information guide

What a parapet is

A parapet is the part of the external wall that is built up above roof level. On a flat roof it holds the edge of the waterproofing and the thermal insulation, and on the facade it gives the house a straight top edge. It is usually built of masonry or concrete, or, on timber-frame houses, of timber studs clad with boards.

A parapet coping has three jobs: to protect the top of the parapet from water, to shed water from the top clear of the facade, and to cover the top edge of the waterproofing dressed over the parapet.

Section through the detail

Section through a parapet coping Masonry parapet wall with external wall insulation. The coping falls towards the roof; at the front it has a drip nose held clear of the facade by a continuous clip. The roof waterproofing is dressed over the parapet beneath the metal. 40 (25 on ventilatedaluminium cladding) ≥ 3° towards roof 1 2 3 4 5 6 7
  1. parapet coping (oplechovanie atiky) falling towards the roof
  2. continuous clip (zaťahovací pás) fixed along the full length
  3. timber backing board, with a separating layer if required
  4. parapet masonry
  5. external wall insulation with render
  6. roof waterproofing dressed over the top of the parapet, under the metal
  7. drip nose held clear of the finished facade
Drawing no.
KV-03
Title
Parapet coping, cross-section
Scale
diagram, dimensions in mm
Revision
14 October 2026

Dimensions and rules

Parameter Value Source
fall of the coping min. 3° (5.25%), towards the roof PREFA; ČSN 73 3610 per Coleman ≥ 3°
projection of the drip nose from the finished facade 40 mm; 25 mm for surfaces not sensitive to moisture PREFA
length of the drip nose 25 mm ČSN 73 3610 per Coleman
overlap of the nose down the vertical wall (standard continuous clip) min. 30 mm PREFA
fixing of the continuous clip along its full length, in two staggered rows, fixings at max. 100 mm PREFA
piece length for a girth up to 500 mm up to 3 m PREFA
piece length for a girth of 600–800 mm up to 1 m PREFA
girth over 800 mm done as seamed roofing PREFA

The joints between pieces must allow for expansion. PREFA describes several options, for example a C-shaped sliding joint strip; the method must be decided before work starts.

Substrate and layers

Under the coping there is usually a backing board, which creates the fall and gives the clips something to fix into. PREFA says that a bituminous separating layer on timber evens out small irregularities and protects the timber during the works, and that ventilating the coping should also be considered.

A warning about titanium-zinc: RHEINZINK points out that unprotected bitumen membranes without a mineral finish and some membranes (PVC, ECB) release acidic substances that damage zinc. If water from such a roof runs onto zinc, the manufacturer requires a protective coating or written confirmation of compatibility from the membrane manufacturer.

Material

Parapet copings are most often made from pre-painted galvanised steel in the colour of the windows or facade, pre-painted aluminium or titanium-zinc. In modern architecture with long straight edges, the stiffness of the sheet matters – thin sheet on a wide parapet ripples. Check the combination of metals on the roof with the material comparison.

The most common defects

  • a flat top, or one falling outwards – water runs down the facade, leaving streaks and algae on the render,
  • a short nose – water gets behind the coping into the insulation,
  • sheet screwed down through the top – every screw is a potential hole,
  • long pieces with no expansion joints – rippling, torn joints,
  • no proper corners – a corner made up from cut pieces and sealant.

Cost

Numiq (updated 14 May 2026) gives €12–35 per m excl. VAT for roof flashing – parapet, ridge – materials not included. The cost of materials depends mainly on the girth: a parapet coping with a 500 mm girth uses half a square metre of sheet per linear metre. The price is also affected by height (scaffolding), the number of corners and whether the backing board is replaced.

The authorities

Under Section 18(5)(a) of Building Act No. 25/2025 Coll., repairing and replacing the surface of a flat roof needs neither a decision on the building plan nor a notification. If you are changing the appearance of the building from public space (for example with a markedly different colour or shape), or the house is a listed monument or in a heritage area, see Flashing – when you need the authorities.

Questions and answers

Which way should a parapet coping fall?
Towards the roof, so that water from the top of the parapet does not run down the facade. PREFA specifies a fall of at least 3° (5.25%); a steeper fall helps stop dirt settling.
How far should the drip nose of a parapet coping project beyond the facade?
PREFA gives 40 mm from the finished wall surface; for surfaces that are not sensitive to moisture, such as ventilated aluminium cladding, 25 mm is enough. According to an expert answer by Coleman quoting it, the Czech standard ČSN 73 3610 specifies a 25 mm drip nose.

Technical sources

The sources this sheet draws on. We checked prices and values from standards on the date shown; for prices, whatever the source currently states always applies. Sources marked “in Slovak” or “in Czech” are only available in that language.

ItemSourcePublished byVersion / dateChecked
01 Tips & tricks – cladding walls and parapets (min. fall 3°, drip nose projection 40 mm / 25 mm, piece lengths) (in Slovak) PREFA Slovakia web article 14 October 2026
02 ČSN 73 3610 Design of sheet-metal building elements – parapet: drip nose 25 mm, fall ≥ 3° (quoted in an expert answer) (in Czech) Coleman S.I. (explaining the Czech standard) web article 14 October 2026
03 RHEINZINK – Information material and processing (alloy to EN 988, electrolytic corrosion, effect of metals placed higher up) RHEINZINK GmbH & Co. KG RZ-INT-002-11-24 14 October 2026
04 VMZINC – Compatibility (compatible and incompatible metals, run-off from copper) VMZINC (VM Building Solutions) web page 14 October 2026
05 Sheet-metal roofing work – indicative labour prices (excl. VAT, excl. materials) (in Slovak) Numiq (price comparison portal) updated 14 May 2026 14 October 2026
06 Building Act No. 25/2025 Coll. (stavebný zákon) – Section 2(10), Section 15, Section 18(4) and (5) (in Slovak) Slov-Lex (Ministry of Justice of the Slovak Republic) wording in force from 1 November 2025 (latest amendment No. 269/2025 Coll.) 14 October 2026
Prepared by
KlampiarskeVýrobky.sk
Revision
Spotted an error?
email us · corrections policy