Verge flashings

A verge flashing – in Slovak záveterná lišta – closes off the roof at the gable, the sloping edge that does not end in a gutter. It protects the edge of the covering from wind that would lift it, and covers the ends of the battens from the rain.

Sheet
Verge flashings
Revision
Sources
4 items
Type
information guide

Section through the verge

Section through a verge with a verge flashing A verge board runs along the roof edge. The verge flashing covers the edge of the roofing up to the first rib, runs down the face of the board and ends in a drip fold. It is screwed through into the roofing. screw 4.8 × 20 mm with washer 1 2 3 4 5 6 7
  1. verge board
  2. roof covering
  3. verge flashing on the covering, with a drip fold
  4. batten
  5. roofing underlay lapped over the gable wall
  6. gable masonry
  7. rafter
Drawing no.
KV-05
Title
Verge with verge flashing
Scale
diagram
Revision
14 October 2026

Two types

Type Where it sits Use
under-covering verge flashing under the edge of the covering, on the verge board or battens stops the wind lifting the covering and leads water into the gutter (MASLEN)
over-covering verge flashing on the covering up to the first rib, running down the face of the verge board fitted after the covering, covers the edge from above

The installation guides say which type belongs with a given roof covering. On tile-effect metal roofing the two are often combined.

Installation

  • Verge board. The roof edge is trued up with a verge board (barge board) or an auxiliary verge batten. Ruukki notes that small differences in the roof dimensions can be taken up by the verge board.
  • Fixing. MASLEN specifies fixing an under-covering verge flashing with 4.8 × 20 mm screws into the verge board or the battens. Over-covering flashings are fixed with 4.8 × 20 mm stitching screws at roughly 300 mm centres.
  • Laps run down the slope, with the upper piece over the lower one.
  • At the ridge the flashing is finished so that it meets the end of the ridge cap.
  • At the eaves the flashing ends over the gutter, so water runs off it into the gutter, not down the facade.

What to watch

  • Wind suction is greatest at the verge. In its guide for standing seam roofing, Ruukki requires closer fixing of the covering in the perimeter zone of the roof (at least 1 m wide); the verge flashing is the last line of protection for this zone.
  • The flashing must overlap the face of the verge board and end in a drip fold, otherwise water gets into the board and it starts to rot.
  • With external insulation on the gable wall, allow for the thickness of the insulation – a flashing measured before the insulation goes on will be too short.
  • The underlay should lap over the gable; for verge trims Ruukki gives a lap of the underlay of at least 200 mm beyond the plane of the wall (in its guide for standing seam roofing).

Cost

Plechy Majer (14 April 2026) lists a verge flashing for its metal roofing at €10 per m incl. VAT (materials). Trims made to measure are priced by girth and material; labour is charged together with the roof flashing.

Technical sources

The sources this sheet draws on. We checked prices and values from standards on the date shown; for prices, whatever the source currently states always applies. Sources marked “in Slovak” or “in Czech” are only available in that language.

ItemSourcePublished byVersion / dateChecked
01 Roofing installation instructions (valley, verge flashing, abutment flashings, ridge capping) (in Slovak) MASLEN s.r.o. 2021 14 October 2026
02 Installation guide – Adamante, Monterrey, Finnera tile-effect roofing and trapezoidal sheets (flashings, valleys, eaves) (in Slovak) Ruukki Slovakia s.r.o. 2024 14 October 2026
03 Installation guide for Classic standing seam roofing (underlay lap at the gable, perimeter zone with closer fixing, eaves flashing) (in Slovak) Ruukki Slovakia s.r.o. 11/2025 14 October 2026
04 What a new roof costs in 2026 – prices of sheet-metal roof trims (incl. VAT) (in Slovak) Plechy Majer, Závadka nad Hronom 14 April 2026 14 October 2026
Prepared by
KlampiarskeVýrobky.sk
Revision
Spotted an error?
email us · corrections policy